Emergency and Restoration
Latest
European Stakeholder Committees
Market Stakeholder Committee
Grid Connection Stakeholder Committee
System Operations Stakeholder Committee
ARCHIVED CONTENT FROM CURRENT SITE
On 1 April 2014, ENTSO-E was mandated by the European Commission to draft these operational rules for electricity under REGULATION (EC) No 714/2009.
Following the requirements set out in ACER’s framework guidelines (Topic 5: Emergency and Restoration), ENTSO-E prepared a preliminary working draft of the code – collecting information based on current best practices from TSOs across Europe regarding Emergency and Restoration. Two informal meetings were held with major stakeholder organisations and ACER to gain early input and proposals on the code.
In June 2014, a preliminary working draft was complete and so ENTSO-E launched the initial formal development and consultation phases on the NC ER. In order to present and discuss this draft and gain further input into the code’s development, ENTSO-E held:
- the first Public Stakeholder Workshop on 9 July 2014;
- the second Public Stakeholder Workshop on 12 November 2014;
- the first Public Consultation from 13 October to 8 December 2014.
In December 2014, after an extensive work in collaboration with stakeholders, the Drafting Team Emergency and Restoration rewrote two sections of the network code: the chapter on market interactions and the article concerning the automatic low Frequency control scheme, which was completed based on an internal study on Low Frequency Demand Disconnection (LFDD) performed by TSOs experts.
To gain further input and proposals from all interested parties on these two specific topics, ENTSO-E held:
- the third Public Stakeholder Workshop on 8 January 2015;
- the second Public Consultation from 15 December 2014 to 14 January 2015;
- the fourth and final Public Stakeholder Workshop on 12 February 2015.
All documents relating to the public consultations, DSO technical expert group meetings, and public stakeholder workshops are available under the ‘Stakeholder Engagement’ section of this page.
Stakeholder Engagement
Stakeholder engagement includes public consultations, DSO technical expert group meetings and public stakeholder workshops, as well as ad-hoc meetings and exchange of views with any interested parties as appropriate. The DSO Technical Expert Groups reflect the importance of involving Distribution System Operators, due to their significant role in contributing to overall system security. The technical experts in this group are designated from the DSO associations CEDEC, EDSO for Smart Grids, Eurelectric and GEODE.
Public Stakeholder Workshops
Related Documents and Links
Visit our online glossary ENTSO-E Metadata Repository (EMR) for help with definitions that are in the network codes.
For further information on NC ER, please contact Kristel Romeo.
Frequently asked questions
Answers to all your questions nicely grouped by topic.