System Operations
European Stakeholder Committees
Market Stakeholder Committee
Grid Connection Stakeholder Committee
System Operations Stakeholder Committee
ARCHIVED CONTENT FROM CURRENT SITE
The System Operation Guideline is one of the network codes/guidelines drafted under the Third Energy Package. In 2015, the European Commission, ACER and ENTSO-E agreed to merge the three operational network codes into a single System Operation Guideline during their preparatory work for Comitology.
The new guideline is composed of the former network codes on Operational Planning and Scheduling (NC OPS), Operational Security (NC OS), and Load Frequency Control and Reserve (NC LFCR).
On 1 December the European Commission published the version of the Regulation establishing a guideline on electricity transmission system operation that was sent to electricity cross-border committee. The first meeting of the electricity cross-border committee on the System Operation Guideline is scheduled on 11 December 2015.
Download the provisional final version of the text
Merged Codes
Frequently asked questions
Answers to all your questions nicely grouped by topic.